S.No PERTICULARS DETAILS
1 State Karnataka
2 Project Name Construction of access controlled four Laning with Paved Shoulder from Mysore to Kushalnagara section of NH-275 from Design Ch.Km.195+550 at Yalachahalli Near SH-117 Yelawala - KR Nagara road Junction to Design Ch.Km.214+535 joining (at ch.km.131+180 approx) to Srirangapatna Bypass Near Paschima Vahini on Hybrid Annuity Mode under NH(O) in the State of Karnataka (Package –V)
3 Length of Project (Km) 18.985 Km
4 Name of the EPC Contractor M/s KNR Constructions Ltd, Hyderabad.
5 Name of the Concessionaire M/s. KNR Sriranganatha Infra Private Limited, Hyderabad
6 Independent Engineer M/s. Chaitanya Projects Consultancy Pvt. Ltd. In JV with FP India Projects Management Consultancy Services Pvt. Ltd. In Association with RUKY Projects Pvt. Ltd. KBL Silicon City, Bastipura, Mysore, Karnataka
7 DPR Consultant M/s Feedback Infra.
8 Letter of Award (LOA) 03-10-2023
9 Concession Agreement Date 22-05-2023
10 Appointed Date 07-04-2025
11 Construction Period 730 Days (2 Years)
12 Concession Period 2 Years + 15 Years.
13 Scheduled Date of Completion 04-06-2027
14 Maintenance Period 15 Years
15 Proposed ROW (m) 45 Mtr. / 60 Mtr.
16 Flexible Pavement 18.275 Km
17 Toll Plaza 1No. Main Toll Plaza @ Ch.205+100 & 2 Nos. 4+100 on main loop of Interchange @ Ch.195+759 (4-Lane-Entry & Exit) near Yalachahalli & 4 Nos. (4-Lane-Entry & Exit) near 203+455 KRS road
18 Interchanges 1 No. Trumpet @ Ch. 214+506
19 Truck Layby 2 No’s
20 Box Culverts/Box Structures 48 Nos.
21 Crossing Box Culverts 26 Nos.
22 Arch Culverts 2 Nos.
23 Pipe Culverts 25 Nos.
24 Aqueduct 1 No.
25 Minor Bridges 22 Nos.
26 ROB 1 No.
27 RUB 1 No.
28 SVUP 3 Nos.
29 LVUP 5 Nos.
30 VUP 4 Nos.
31 VOP 4 Nos.
32 Trumpet Interchange 1 No.