Scope of Work :

S.No PERTICULARS UNITS DETAILS
1 Pavement   MCW-Flexible
SR-Flexible
2 By Passes    
I. No of Locations  Nos 1
II. Length kms 18.985
3 Service Road/Slip Road    
I. Total Length (BHS)  Kms 9.26
4 ROW m 45/60
5 At Garde Intersections Nos 2

Structures :

S.NO DESCRIPTION UNITS DETAILS
1 ROB Nos 1
2 RUB Nos 1
3 Flyover/Trumpet Nos 1
4 VUP Nos 4
5 LVUP   5
6 SVUP Nos 3
7 VOP Nos 4
8 Aqueduct Nos 1
9 Box Culverts    
I. New Consturction Nos 48
10 Arch Culvert Nos 2
11 Pipe Culvert No5 25
12 Cross Road Culverts Nos  
13 Over Head Signs Nos  
14 Minimum Length of Street Lighting kms  
15 Minimum length of RCC Lined Drain kms  
16 Toll Plaza No 1
17 Truck Lay Bye No 1